Appeal to the
FY 2000 OMB Passback
Associate Administrator for Air Traffic Services
(dollars in thousands)
 

Priority Included (Inc)
or Not Included
(NI) in OMB
Request
Increase
Over
Passback
Requested
($ in K)
Rationale

1

Inc

57,000

Streamlining to Offset NATCA. - OMB applies a streamlining reduction for tile NATCA agreement that is in part already considered in the request. In the formulation of the initial agency request, an FY 2000 increase of 250 air traffic controllers for $7.4 million was approved. The NATCA agreement allowed us to forego the increased staffing, providing a cost avoidance and streamlining savings. Additionally, the request includes an additional $8.6 million in reductions attributable to the agreement. Taking non-existent NATCA agreement savings will result in reductions in operational areas.
 
  Inc 7,254 NAS Hand-Off, Air Traffic Backfill (BFOT) Overtime - In fiscal year 2000, 28 major systems will be undergoing operational implementation which will require the use of backfill overtime for controllers to be trained. Controllers need to be removed from their operational positions to receive training on the new systems. Classroom training time requires that other controllers are brought in to "backfill" the operational position and overtime is required to pay these controllers. Without this training, the new systems cannot be accepted and made operational. Specifically, in order for new systems such as Display System Replacement, Standard Terminal Automation Replacement System, Operational and Supportability Implementation System, and others to become operational, it is a must to have additional staffing through the use of BFOT, to cover the operations in both the new and the old control rooms simultaneously. The training on the new systems ensures that we will provide safe air traffic control services to the general public. The FAA has been replacing aging equipment through the NAS Modernization process and without the ability to train the controllers on the new equipment, the new equipment will not become operational.
 
  Inc 4,700 .Air Traffic Technical Training - If FAA is to maintain its standard of technical training for air traffic controllers, the Academy instructional support costs will increase by $2,500K due to the increased number of students who require advanced and refresher training, as well as to accommodate the backlog of students from FY 1999. Training is also required for Display System Replacement and Standard Terminal Automation Replacement System. A centralized tracking database for proficiency training of all controllers, TRAX, will require $900K for final development and is a necessary component of an air traffic controllers' training plan to ensure training is accomplished within specific timeframes. An increase of $1,300K is required to further develop Computer-Based Instruction (CBI). Course development into a CBI format is the most efficient training aid for an air traffic controller in order to maintain proficiency to reduce operational errors. There are currently 90 CBI courses that cover 150 hours of training in field facilities. This funding requirement will also ensure that 1,240 CBI instructor/student platforms are maintained and upgraded to accommodate new technology.
 
  Inc 3,967 AFSS Streamlining - It is imperative that flight service staffing does not fall below 3,000 full-time permanent employees. Under the current architecture of 61 automated flight service stations (AFSS), approximately 16,000 flight services are handled per specialist. Any further reductions in staffing would cause reduction in hours of operation at AFSS's leading to derogation of essential services, such as search and rescue, lost aircraft orientation, and en route flight advisory service. Reducing the staffing of the AFSS's would critically impact safety. AFSS's continue to be the primary source for providing pre-flight aviation weather briefings and flight planning information for the general aviation pilot, with the AFSS being the first contact a pilot has with the FAA.
 
  Inc 2,500 Controller Training Contract - Increase in funds is necessary to continue on-site training for 1,505 air traffic controllers hired in FY 1997 and 1998, and to begin on-site training for approximately 250 air traffic controllers planned to be hired each year during FY 1'999 and 2000 to backfill attrition. After initial training at the FAA Academy, new hire report to an FAA facility for approximately three (3) years of facility-specific training. Without the budget increase, new controllers would not be able to perform any meaningful function until the mandatory facility-specific training can be accomplished. Field facilities do not have sufficient personnel resources to assume these additional training duties ($1,200K). Also, an increase in funds is necessary to provide training for the Northern California TRACON, Potomac TRACON, and Honolulu CERAP consolidations in FY 2000 ($1,300K).
 
  NI   Aeronautical Charting - The Passback assumes that the aeronautical charting and cartography function will be transferred from the National Oceanic and Atmospheric Administration to the FAA in FY 1999. The FAA requests, that if this transfer is to tab place, that it occur in FY 2000 rather than FY 1999. This additional time is needed to ensure that the FAA has the proper authority to operate the program effectively. For example, the FAA needs the authority to establish chart prices and to retain the receipts from chart sales to the public by establishing a revolving hind. This returns revenue to the program from chart sales. Without this revolving fund, receipts from chart sales go directly to the Treasury creating the need for an additional $9M in appropriation. Delaying the transfer until FY 2000 will also provide the FAA time to incorporate the charting program and its 378 personnel and 3 bargaining units into existing FAA cost accounting and personnel systems and establish a new revolving fund.
 
  NI 3,378 Airspace Redesign - The expansion of the National Airspace Redesign beyond the eastern half of the U.S., will result in till increase in expected costs for airspace and route changes, environmental regulation impacts, and union/agency collaboration efforts. This expansion will need to occur due to factors such as Display System Replacement (DSR) delivery at ARTCC's in the western U.S. and Special Use Airspace issues in the southwest. The ARTCC's must make airspace changes to facilitate the operational acceptance of this new equipment. Both NAS users' and Department of Defense's concerns regarding Special Use Airspace in the southwest U.S. has also placed an additional need for resources in issue resolution through airspace redesign and additional costs associated with environmental studies to meet legal requirements and union/management collaboration efforts. The plans and designs developed at these meetings are for re-sectorization and re-alignments needed to support Free Flight Phase 1 and DSR operational deployment.
 
  Inc/NI 3,500 Increase ill funds is necessary to continue on-site training for 1,505 air traffic controllers hired in FY 1997 and 1998, and to begin on-site training for approximately 250 air traffic controllers planned to be hired each year during FY 1999 and 2000 to backfill attrition. After initial training at the FAA Academy, new hires report to an FAA facility for approximately three (3) years of facility-specific training. Without the budget increase, new controllers would not be able to perform any meaningful function until the mandatory facility-specific training can be accomplished. Field facilities do not have sufficient personnel resources to assume these additional training duties ($1.2M). Also, all increase in funds is necessary to provide training for the Northern California TRACON, Potomac TRACON, and Honolulu CERAP consolidations in FY 2000 ($1.3M). An increase in funds is necessary for a new requirement to provide training for the Atlanta TRACON consolidation in FY 2000 ($.5M). In formulating the submission to OMB, we anticipated this requirement would be needed in FY 2001; since that time the requirement has been moved forward to FY 2000. Therefore, this request was not included in the submission to OMB. Increase in funds is necessary for a new requirement to provide additional support for the Cooperative Education Program ($.5M).
 